Preparing an automated metro for passenger service
PT&I supported the transition from project delivery into safe, compliant automated operations, connecting operational safety, assurance evidence and stakeholder readiness.
Sector
Passenger rail
Focus
Operational readiness
Network
Automated metro
Location
Sydney, NSW
30 km
of metro rail in the City & Southwest project context
Safety
cases connecting hazards, controls and evidence
Service
readiness carried through to passenger operations
The challenge
The new network combined underground stations, converted legacy corridors and automated operations. As opening approached, the operator needed a defensible safety case connecting hazards, controls, training and operational evidence, while delivery partners, operators and regulators stayed aligned.
What we did
Working within the operator's team, PT&I developed operational safety cases and risk-based assurance. The team traced controls to accountable people and supporting evidence, clarified operational responsibilities and brought stakeholders together early enough to resolve readiness issues before service commencement.
Outcomes
The work established a clearer, evidence-led basis for commencing automated metro operations. It also left the operator with a practical framework for understanding responsibilities, maintaining safety evidence and managing operational risk beyond opening day.
PT&I helped the operator establish what could go wrong, how risks would be controlled and who was accountable, with the safety evidence to support passenger operations from opening day onwards.
OPERATIONAL READINESS
Operational safety cases developed around real accountabilities
Hazards, controls and evidence connected
Delivery and operational stakeholders aligned
A framework designed to remain useful beyond opening
PT&I provided embedded engineering leadership across design, systems integration, testing, commissioning and operational readiness for Parramatta Light Rail Stage 1.
Sector
Light rail
Discipline
Engineering integration
Phase
Testing to operations
Location
Western Sydney, NSW
12 km
light rail corridor
130,000
People living within walking distance of the 16-stop service
22,000
Projected daily passengers in 2026, with 50+ services operating from 5am to 1am every day.
The challenge
New vehicles, traction power, digital signalling and communications had to work together across a busy established corridor. Multiple suppliers, legacy infrastructure, technical interfaces and assurance gates needed to be resolved as one operational system, not as separate delivery packages.
What we did
PT&I coordinated technical disciplines and suppliers, managed interfaces and defects, and supported assurance, configuration and type-approval decisions. The role extended through dynamic testing and trial running, keeping every technical decision connected to safe, reliable passenger operations.
Outcomes
PT&I's embedded leadership supported the program from design packages and technical assurance through to dynamic testing, trial running and First Passenger Service. The result was a more integrated route from construction completion to an operational tramway.
The focus stayed on the whole system: whether every asset, supplier and assurance decision could come together in an operation the public could rely on.
WHOLE-SYSTEM DELIVERY
Engineering disciplines and suppliers coordinated
Technical interfaces and defects actively managed
Assurance and configuration gates supported
Testing and trial running connected to passenger operations
Building the capability to receive a national freight railway
PT&I helped strengthen the operational integration, governance and repeatable readiness practices needed to receive new Inland Rail assets with confidence.
Sector
Freight rail
Discipline
Operational integration
Scale
National program
Location
VIC, NSW & QLD
1,600 km
freight program context
3
states connected by the program
Repeatable
readiness and handover models
The challenge
A railway of this scale is not complete when the physical assets are built. The receiving organisation also needs the operating model, governance, safety evidence and handover discipline to take on new assets confidently as different sections enter service.
What we did
Working within program governance, PT&I helped define and progress scenario planning, operational concepts, safety-case co-development, governance frameworks and capability uplift. The team embedded integration thinking and tools into the organisation rather than leaving behind a standalone report.
Outcomes
The work strengthened operational maturity, clarified responsibilities and established more consistent readiness planning. Reusable approaches for configuration, handover, operations and maintenance were designed to reduce handover risk and support clearer decisions across program phases.
The asset and the receiving organisation have to become ready together. PT&I made that connection practical and repeatable.
ORGANISATIONAL READINESS
Priority operational-readiness workstreams defined
Governance and safety-case development supported
Responsibilities and decision pathways clarified
Repeatable configuration and handover approaches established
PROJECT ENERGYCONNECT
Case study · Energy transmission
Bringing sharper control to a major energy connection
Project EnergyConnect is designed to strengthen electricity supply across South Australia, New South Wales and Victoria, supporting more renewable generation and lower power bills. PT&I led planning and project controls, strengthening delivery visibility and stakeholder alignment.
Sector
Energy transmission
Discipline
Planning & project controls
Purpose
Energy security & renewable integration
Location
SA, NSW & VIC
900 km
Approximate interconnector length, linking SA and NSW with a connection to Victoria
800 MW
Approximate electricity transfer capacity
$180m
Projected annual electricity savings for NSW customers
The challenge
Delivering a 900km electricity interconnector across three states means coordinating transmission lines, substations and network connections while navigating land access, environmental approvals and competing stakeholder needs. With so many interdependent activities, the program needed clear schedules, reliable cost and risk information, and a shared understanding of priorities to keep delivery on track.
What we did
PT&I led planning and project controls, strengthened the maturity of project-control systems and worked with major stakeholders to make delivery information more useful. The role brought schedule, priorities and emerging issues into a shared program view.
Outcomes
The strengthened planning and controls environment improved delivery visibility and stakeholder relationships. PT&I's source material records several major milestones delivered ahead of the contract program and under budget, giving the team a stronger platform for the remaining work.
Good project controls do more than report the past. They give leaders the shared picture they need to make the next decision in time.
PLANNING & PROJECT CONTROLS
Planning and control maturity strengthened
Delivery information made more decision-ready
Major stakeholder relationships improved
Milestones recorded ahead of program and under budget
Making a complex brownfield station ready for what comes next
Loganlea station is moving 500m south, opposite Logan Hospital, to improve access to health, education and community services. PT&I is guiding staging and migration, testing and commissioning, and asset handover while the existing station remains open.
Sector
Passenger rail
Discipline
Integration, testing & commissioning
Status
Under construction
Location
Loganlea, QLD
$173.76m
Total project investment published by Transport and Main Roads
500m
Station relocation south, opposite Logan Hospital
Step-free
Planned access through ramps, lifts and raised platforms for level boarding
The challenge
The existing station must remain open while its replacement is built 500m away. New platforms, lifts, station systems and road connections must fit into an operating railway, with provision for future track and the Logan and Gold Coast Faster Rail project. Construction staging, temporary works and technical interfaces all need a coordinated path through testing, assurance and handover.
What we did
PT&I worked alongside MDJV to review the issued-for-construction design, lead value engineering and optioneering, coordinate temporary works and manage technical risk. The team shaped the operational-readiness, testing, commissioning, migration, acceptance and handover strategies, authored the supporting plans, and led engineering and assurance discussions with the client.
Outcomes
Critical planning and integration gaps were identified early, and the first-stage track slew was completed safely. The project is progressing towards an accessible station with level boarding, improved lighting and CCTV, better walking and cycling connections, and a relocated park 'n' ride. These upgrades are intended to improve access to Logan Hospital, education facilities and the wider community while supporting future rail capacity.
“A fantastic result that reflects the expertise, coordination and commitment of every team involved.”
PT&I PROJECT TEAM
Critical design and integration gaps identified early
Operational-readiness, testing and acceptance strategies aligned
First-stage track slew completed safely
A clear path towards an accessible, operational station
Our people plan the work, advise on the technology, lead the engineering, prove the systems work together, and get your team ready for opening day.
Team
25+ highly skilled and experienced professionals
Expertise
100+ years of combined experience in the leadership team alone
Offices
Our head office is in Sydney, with a growing team in Brisbane. We also know how to use airports.
Get in touch
Let’s start something really big together. Talk to us →
Helen Wilkinson
CEO Director Operational Integration & Advisory
Three decades in defence, rail and transport, in senior roles on both sides of the table. Helen keeps teams focused on the goals, and isn't afraid to challenge assumptions.
“I’m not afraid to challenge assumptions.”
Mark Scott
Chairman
Mark has founded and run successful consulting businesses across transport, defence and energy. He's happiest when driving complex projects to beat their targets.
“I’m happiest driving complex projects past their targets.”
Andrew Vagi
Director Engineering & Project Delivery
Andrew brings 20+ years in engineering and transport, from first concept to trains running. He combines delivery experience with data-backed decisions.
“I take it from first concept to trains running.”
Katie Carles
Business Operations Manager
Katie is our administrative maestro: turning chaos into calm and orchestrating our team behind the scenes so we never miss a beat.
“I keep PT&I's trains running on time!”
Our Team at Work
Josh Boyd, Principal; Andrew Vagi, Director Engineering & Project Delivery; Codruta Bastucescu, Senior Consultant.